General Facility Information
| Name: | Arrow Linen |
| Address: | 467 Prospect Ave |
| City: | Brooklyn |
| State: | NY |
| Zip Code: | 11215 |
| County: | Kings |
| Category: | Commercial Laundry |
| Facility Website: | |
| SIC: | 72 - Personal Services |
| NAICS: | 81 - Other Services (Except Public Administration) |
| ISO Zone: |
J
- New York City
|
| Electric Utility: | Consolidated Edison |
| Gas Utility: | KeySpan East |
| Time Zone: | Eastern Time |
| Latitude: | 40.66 deg N |
| Longitude: | 73.984 deg W |
| Altitude: | 164 feet MSL |
| Developer Name: | Energy Concepts |
| Developer Website: | http://www.nrg-concepts.com |
| NYSERDA Project Number: | 7318 |
| NYSERDA Project Manager: | Jaime Ritchey |
| DG System Ownership: | Facility |
| DG System Enclosure: | Outdoor |
| System Application: | Combined Heat and Power |
|
| Number of Power Units: | 2 |
| Primary Fuel: | Natural Gas |
| Total Installed Capacity: | 300 kW |
| Operating Hours Per Day: | 16 |
| Operating Days Per Week: | 6 |
| Operating Months Per Year: | 12 |
| Peak Electric Demand: | 520 kW |
| Total Annual Electricity Usage: | |
| Total Annual Gas Consumption: | |
| Number of Heat Exchangers: | 2 |
| Standalone Capability: | No |
| Heat Supply Temperature: | 205 degrees F |
| DG System Installation Cost: | |
| Third Party Operation: | No |
| Third Party Maintenance: | No |
| Maintenance Cost: | 0.01 $/kWh |
| Government Subsidies: | |
| Chiller Efficiency: | |
| Boiler Efficiency: | |
| Electricity Export to Grid: | No |
| Facility Electric Service Voltage: | Secondary |
| Gas Commodity Purchased: | Yes |
| Average Gas Cost: | 5.5 $/MMBtu |
| Average Fuel LHV: | 920 |
|
| Base Electric Rate: |
SC 9-1 General Large - Low Tension; New York City -
Nov05-Oct06
|
| CHP Electric Rate: |
SC 14RA Standby - SC 9-1 Base; Low Tension; New York City -
Nov05-Oct06
|
| CHP Contract Demand: | 500 |
|
NYSERDA Incentive Program Information
|
Unit 1
|
| Description: |
Engine 1 |
| Manufacture Date: |
|
| Installation Date: |
04/01/2003 |
| Commission Date: |
|
| Decommission Date: |
|
| Installed Capacity: |
150 kW |
| Efficiency: |
21.2 % |
| Thermal Output: |
0.35826 MMBtu/h |
| Technology Group: |
100-800 Reciprocating Engine
(Lean Burn)
|
| Prime Mover: |
Reciprocating Engine |
| Fuel: |
Natural Gas |
| Generator Type: |
Induction Generator |
|
| Prime Mover Manufacturer: |
CoastIntelligen |
| Prime Mover Model: |
150-IC with ECS |
| Heat Recovery: |
Hot Water |
| Primary Heat Recovery Use: |
Domestic Hot Water |
| Secondary Heat Recovery Use: |
Boiler Feedwater Pre-heat |
| Emissions Control Technology: |
Unknown |
| Genset Packager: |
|
| System Installer: |
Energy Concepts |
| Component Integration: |
Customer Assembled |
| Controller: |
Third-party Off-the-shelf |
| Demonstration PON: |
669 |
|
|
Unit 2
|
| Description: |
Engine 2 |
| Manufacture Date: |
|
| Installation Date: |
04/01/2003 |
| Commission Date: |
|
| Decommission Date: |
|
| Installed Capacity: |
150 kW |
| Efficiency: |
21.2 % |
| Thermal Output: |
0.35826 MMBtu/h |
| Technology Group: |
100-800 Reciprocating Engine
(Lean Burn)
|
| Prime Mover: |
Reciprocating Engine |
| Fuel: |
Natural Gas |
| Generator Type: |
Induction Generator |
|
| Prime Mover Manufacturer: |
CoastIntelligen |
| Prime Mover Model: |
150-IC with ECS |
| Heat Recovery: |
Hot Water |
| Primary Heat Recovery Use: |
Domestic Hot Water |
| Secondary Heat Recovery Use: |
Boiler Feedwater Pre-heat |
| Emissions Control Technology: |
Unknown |
| Genset Packager: |
|
| System Installer: |
Energy Concepts |
| Component Integration: |
Customer Assembled |
| Controller: |
Third-party Custom |
| Demonstration PON: |
669 |
|
Reports and Other Information
|
Facility Details
Facility Documentation
Project Websites
Related Webpages
None
|
Online Monitored Data Reports
Standardized Monitored Data Reports
Operational/Reliability Reports
Emissions Reports
None
|
|